MNRE:Standard Bidding Document For Solar Water Pumping Systems
Cumulative Experience of the Bidder in executing contracts of Off-Grid Solar Photovoltaic Systems/Power plants (Installed &Commissioned) should be at least 20% of the tender value. Average Annual Financial Turnover during the last 3 years, ending 31st March of the previous financial year should be at least 30% of the estimated cost/ Tender Value. (OR Rs.50 Crores, whichever is less). [Certified copies of the annual returns submitted to the ‘Registrar of Companies’ (R.O.C.) should be enclosed. For the preceding year, a summarized sheet of turnover certified by registered CA may be enclosed. For proprietary/partnership companies, copies of Income Tax returns with full details of turnover should be enclosed. A summarized sheet of turnover certified by registered CA should also be enclosed. More Information SBD_Solar-Water-Pumping-Systems
Related posts:
- DESIGN, DRAWING, SUPPLY, INSTALLATION AND COMMISSIONNING TOTAL 185 KW ROOFTOP/ GROUND MOUNTED PV SOLAR POWER PLANT AT NASIRABAD CANTT
- Expression of Interest for Procurement of Renewable Energy Under Short Term basis To Reliance Industries Limited In Gujarat and Maharashtra
- Const of Solar based M WS Scheme
- REIL Issues NIT for supply of 150,000 Nos Solar Cells 4.60 Watt