NIT for 2.5 MW Solar and wind hybrid power plant in Rangreek, HP – Amendments and Clarifications
23
0
Amendments and Clarifications to NIT No.: SECI/SD/NIT/2016/6/RANGREEK2.5 for DESIGN, ENGINEERING, PROCUREMENT & SUPPLY, CONSTRUCTION & ERECTION, TESTING, COMMISSIONING, ASSOCIATED TRANSMISSION SYSTEM FOR GRID CONNECTED 2 MW SOLAR PV+ 0.5 MW WIND HYBRID (AC) POWER PLANT WITH 1 MWh ENERGY STORAGE SYSTEM & COMPREHENSIVE OPERATION & MAINTENANCE FOR 5 (FIVE) YEARS OF INSTALLED 2.5 MW HYBRID POWER PLANT WITH 1MWh ENERGY STORAGE SYSTEM AT VILLAGE -RANGREEK, SUBDIVISION – KAZA, DISTRICT – LAHAUL SPITI IN THE STATE OF HIMACHAL PRADESH have been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser).
Kindly use the Tender Search Code (TSC): SECI-2016-TN000006
Related posts:
- Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years at GAIL Petrochemical Complex, Pata, Auriaya, (U.P)
- SUPPLY OF OP WKS STORES
- PROVN OF SOLAR ENERGY PROJECT AT CME PUNE JOB NO SC/MW/1242
- Supply of Solar PV Power Plants on turn-key basis in Tripura