NIT for Conversion of Existing Non-Functional Off Grid Solar Plant at State Govt. Institutions
0
0
NIT for Conversion of Existing Non-Functional Off Grid Solar Plant at State Govt. Institutions along with Five (5) Years of Comprehensive Operation and Maintenance, Connectivity and Synchronization of the System with the Grid and Net Metering
The last date to submit the bids is March 25, 2021
For more information please see below link:
Related posts:
- MPUVNL Floats 30 MW Solar Tender in Madhya Pradesh
- Implementation of more than 32 MWp Grid Connected Roof Top Solar PV Systems
- MPUVNL Invites RFP For standardization of rates and Selection of Contractors For Supply of Solar PV Water Pumping Systems in Madhya Pradesh
- RFP for Selection of Developers for Implementation of 100 MW Solar based power plants