NIT for Setting up a Rooftop Grid Synchronized Solar Power Generation with Battery Backup Facility Atop
260
0
NIT for Setting up a Rooftop Grid Synchronized Solar Power Generation with Battery Backup Facility Atop
For more information please see below link…
Related posts:
- SITC of 1.5 KW capacity solar power pack system at Mayanbari SO under Nalbari-Barpeta Division Nagarbera under Guwahati Division Bindukuri under Darrang Division Assam
- Offer for Installation and 5 Years maintenance of approx 100 nos of Solar LED HIGH MAST Street Lighting Systems in Various Villages in parliamentary constituency Giridih, Jharkhand
- Supply of Solar Simulator as specifications
- Manpower requirements for assistance in Solar PV Modules testing jobs in STP plant at Mumbai