NIT FOR SETTING UP OF CUMULATIVE 200 MW GRID-CONNECTED SOLAR POWER PROJECTS WITH 300 MWHR BESS IN ANDHRA PRADESH
Solar Energy Corporation of India Ltd. (SECI) invites online bids for Setting up of a cumulative capacity of 200 MW Grid-Connected Solar PV Power Projects with 300 MWhr Battery Energy Storage Systems (BESS) in the State of Andhra Pradesh, as per following configuration:
(i) 100 MW Solar PV Power Project with 150 MWhr BESS at Galiveedu Site of Ananthapuramu Ultra Mega Solar Park, Andhra Pradesh
(ii) 100 MW Solar PV Project with 150 MWhr BESS at Talaricheruvu Solar Park, Andhra Pradesh
The detailed Request for Selection Document (RfS) shall be available for downloading latest by 30.04.2019 on www.tcil-india-electronictender.com. Prospective bidders are requested to remain updated for any notices/amendments/clarifications etc. to the RfS document through the websites www.seci.co.in and www.tcil-india-electronictender.com as no separate notification will be issued.
For any query related to this tender, bidders may reach us over ph.no: 011-71989236 / 84 or mail us on contracts@seci.co.in
Tender Rights: SECI reserves the right to reject any or all tenders in part or full without assigning any reason whatsoever and without thereby any liability.
Source: seci.co.in
Related posts:
- Mobilising finances to reduce climate change will need bold action: WB By Lalit K Jha
- India, China to lead the emerging nations’ green bonds market in 2018
- 21 IORA countries adopt the Delhi Declaration on Renewable Energy; to tie up with ISA members
- DuPont Highlights Solar Innovations at 2020 SNEC PV Power Expo