ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis
63
0
ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis at the petitioner’s premises by relaxing the provisions of regulations which restrict the maximum capacity at 1 MW with the following material allegations.
For more information please see below link:
Related posts:
- “ISA Trillion Dollar Opportunity to serve Humanity” Shri Piyush Goyal
- Discussion Paper on “Market Based Economic Dispatch of Electricity: Re-designing of Day-Ahead Market (DAM) in India”.
- LONGi Starts Work on Its 15GW Mono-Si Ingot and Wafer Plant in Yinchuan
- L&T gains after construction arm bags ‘major’ orders
tags:
ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems) Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis