1. Home
  2. Featured
  3. ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis
ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis

ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis

63
0

ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis at the petitioner’s premises by relaxing the provisions of regulations which restrict the maximum capacity at 1 MW with the following material allegations.

For more information please see below link:

 

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *