OREDA Issue Tender for Supply of 910 KW Solar power projects along with Comprehensive Maintenance for Five (5) years at 20 OPTCL Grid sub-stations in Odisha – EQ Mag
0
0
OREDA Issue Tender for Supply of 910 KW Solar power projects along with Comprehensive Maintenance for Five (5) years at 20 OPTCL Grid sub-stations in Odisha
For more information please see below link:
Related posts:
- Civil and Associated Work for 6.5 MW Solar Power Plant at Nalanda University, Rajgir Bihar
- Providing and Erecting Solar Power Pack System at Dist. Hingoli
- MSEDCL Issue Tender For Supply of 500 MW (AC) solar power from decentralized solar projects – EQ Mag Pro
- OREDA Issue Tender for Supply of 631 KW Rooftop Solar Power System with 6 hours of battery backup system at 98 Schools – EQ Mag