Petition CERC (Power Market) Regulations, 2010 for approval of introduction of the Real Time Market (RTM) Contracts at IEX
0
0
Petition under Regulation 7 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 for approval of introduction of the Real Time Market (RTM) Contracts at Indian Energy Exchange Limited.
For more information please see below link:
Related posts:
- Draft CERC (Terms and Conditions of Tariff)(First Amendment) Regulations, 2020
- Petition filed by INOX Renewable for the approval of PPA with KSEBL for 16 MW Wind Power Project at Kanjikode
- In the matter of: Approval for determination of Transmission tariff from COD to 31.3.2019
- Petition For Releasing The Outstanding Payment Accrued in Favour of The Petitioner
tags:
CERC