![Petition determination of tariff for the 2019-24 tariff period for Bhadrawati (Chandrapur) HVDC backto-back station (2×500 MW) in Southern Region and Western Region – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition determination of tariff for the 2019-24 tariff period for Bhadrawati (Chandrapur) HVDC backto-back station (2×500 MW) in Southern Region and Western Region – EQ Mag
0
0
Petition determination of tariff for the 2019-24 tariff period for Bhadrawati (Chandrapur) HVDC backto-back station (2×500 MW) in Southern Region and Western Region.
For more information please see below link:
Related posts:
- Petition for determination of tariff in respect of the Bairasiul Power Station (180 MW). NHPC India Limited (NHPC) – EQ Mag Pro
- Petition for determination of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for determination of tariff of Nabinagar Thermal Power Project (1000 MW) – EQ Mag Pro
- Petition for determination of tariff for the year 2020-21 to 2023-24 in respect of RVPNL-owned transmission lines/system connecting with other States and Intervening transmission lines – EQ Mag