Petition documents for getting Net Meter connectivity of 1 MW roof top grid connected solar power plant
0
0
Petition Number 1615 of 2020 – Institute of Engineering and Technology vs UPNEDA – Petition documents for getting Net Meter connectivity of 1 MW roof top grid connected solar power plant at IET Lucknow set up under Upneda Resco Scheme for installation of roof top solar plants in Govt. buildings/Institutions with Net Metering facility in Petition no 1615/2020
For more information please see below link: