1. Home
  2. Policy & Regulation
  3. Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25
Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25

Petition filed by M/s Jindal Steel and Power Ltd. for determination of ARR for the MYT control period from FY 2022-23 to FY 2024-25

0
0
Anand Gupta Editor - EQ Int'l Media Network