![Petition filed by M/s Rajiv Gandhi Co-operative Society and M/s Solgen Energy Pvt. Ltd for the permission for the Grid Connectivity of 100 kWp solar panel in the premises of Rajiv Gandhi Co-operative Hospital, Palakkad – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2020/02/KSERC-Renewable-Energy-and-Net-Metering-Regulations-2020.jpg)
Petition filed by M/s Rajiv Gandhi Co-operative Society and M/s Solgen Energy Pvt. Ltd for the permission for the Grid Connectivity of 100 kWp solar panel in the premises of Rajiv Gandhi Co-operative Hospital, Palakkad – EQ Mag Pro
0
0
Petition filed by M/s Rajiv Gandhi Co-operative Society and M/s Solgen Energy Pvt. Ltd for the permission for the Grid Connectivity of 100 kWp solar panel in the premises of Rajiv Gandhi Co-operative Hospital, Palakkad.
For more information please see below link:
Related posts:
- Seeking approval for entering into short term PPA
- KSERC Approved Petition of HINDALCO Industries Ltd
- Petition Seeking Interim Order For Approval For Procurement of 200 MW Solar Power From Inter State Transmission System Grid Connected – EQ Mag Pro
- Petition for seeking approval for entering into short term power procurement arrangement through banking transactions – EQ Mag Pro