![Petition filed under Regulation of UPERC (Grant of Connectivity of Intra State Transmission system ) Reg. 2010 – EQ](https://www.eqmagpro.com/wp-content/uploads/2020/03/UPERC-seeking-withdrawl-of-huge-liabilities-wrongfully-imposed-on-petitioner-for-five-months-and-two-days.jpg)
Petition filed under Regulation of UPERC (Grant of Connectivity of Intra State Transmission system ) Reg. 2010 – EQ
0
0
Petition filed under Regulation of UPERC (Grant of Connectivity of Intra State Transmission system ) Reg. 2010
For more information please see below link:
Related posts:
- Petition For Relevant Provisions of PPA
- Petition For Seeking approval of Çhange in Law events as per PPA between NPCL and DIL for supply of power to NPCL – EQ Mag Pro
- Petition For Seeking approval for entering into Power Procurement Arrangement by way of PPA for the purposes of procuring solar power from 65 MW Kalpi solar PV Power Project – EQ Mag Pro
- Petition for Seeking extension of time for setting up of 5 MW Solar PV Power Project under the PPA – EQ Mag