
Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
0
0
Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects – EQ
- Petition for Adoption of tariff for the ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/1200 MWh Energy Storage System – EQ
- Petition for Adoption of Tariff of 960 MW from ISTS connected Wind-Solar Hybrid Power Projects system under TBCB process – EQ
tags:
1200 MW Adoption of Tariff CERC Despatchable Power ENERGY STORAGE SYSTEM GREENSHOE OPTION ISTS-CONNECTED RE power projects REGULATIONS