Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects – EQ
0
0
Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects
For more information please see below link:
Related posts:
- Petition for revision of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro
- Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat – EQ Mag Pro
- Petition for revision of tariff of Bhilai Expansion Power Plant (500 MW) NTPC-SAIL Power Company Limited – EQ Mag Pro
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of solar power developers for setting up of 500 MW ISTS-connected Solar PV Power projects in India