![Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers for setting up of 100 MW ISTS-connected Wind Power projects – EQ](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers for setting up of 100 MW ISTS-connected Wind Power projects – EQ
0
0
Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers for setting up of 100 MW ISTS-connected Wind Power projects
For more information please see below link:
Related posts:
- Petition For Determination of Project Specific Levelised Tariff For 100 MW Floating Solar Photo Voltaic Plant
- Petition for determination of project specific levelised tariff for 100 MW Floating Solar Photo Voltaic Plant at water reservoir of Ramagundam Super Thermal Power Station, Telangana – EQ Mag Pro
- Petition of PPA entered into between Dhariwal Infrastructure Ltd. and TNGEDCO. for the supply of 100 MW Contracted Capacity from Unit 2 of its 2 x 300 MW Coal based thermal generating station located at Tadali – EQ Mag Pro
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for selection of wind power developers for setting up of 100 MW ISTS-connected Wind Power projects in India – EQ