Petition for Adoption of Tariff discovered through Competitive Bidding Process for Setting up of 1200 MW ISTS-connected Solar PV Power Projects (Solar-2) – EQ
0
0
Petition for Adoption of Tariff discovered through Competitive Bidding Process for Setting up of 1200 MW ISTS-connected Solar PV Power Projects (Solar-2)
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plant connected to Inter-State Transmission System linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro
- Petition for adoption of tariff for 550 MW grid connected solar PV power projects selected through competitive bidding process – EQ Mag Pro
- Petition for Adoption of Tariff discovered through Competitive Bidding Process for procurement of power from the 1200 MW Grid-Connected Solar PV Power Project at Village- Kalijal – EQ Mag
- Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag