Petition for adoption of tariff for 1170 MW Wind-Solar Hybrid Power Projects (Tranche V) connected to Inter-State Transmission System – EQ Mag
0
0
Petition for adoption of tariff for 1170 MW Wind-Solar Hybrid Power Projects (Tranche V) connected to Inter-State Transmission System
For more information please see below link:
Related posts:
- CERC Declares Order on Petition Seeking Payment of Change in Law Compensation from SECI
- Petition for adoption of tariff for Renewable Energy Projects connected to ISTS with Assured Peak Power Supply in Indian and selected through Competitive Bidding Process – EQ Mag Pro
- Petition of PPA for the development of 390 MW ISTS connected Wind-Solar Hybrid power project(s), entered between Adani Hybrid Energy Jaisalmer One Limited and SECI – EQ Mag
- Petition for seeking issuance of appropriate order(s) from this Commission that the imposition of safeguard duty on the import of solar cells, whether or not assembled in modules or panels – EQ Mag