Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System – EQ Mag Pro
0
0
Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System.
For more information please see below link:
Related posts:
- Petition For Truing Up of Tariff For 1200 MW Dgen Mega Power Project of Torrent Power Limited
- Petition for connectivity to the ISTS (inter-State transmission system) for a quantum of 500 MW, as a “bulk consumer” located at Moti Khavdi, Jamnagar, Gujarat – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for seeking relaxation of the procedure set out of Detailed Procedure for “Grant of Connectivity to Projects Based on Renewable Sources to Inter-State Transmission System” – EQ Mag Pro