1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag
Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag

Petition for adoption of tariff for 1200 MW Wind-Solar Hybrid Power Projects (Tranche-IV) connected to the ISTS and selected through competitive bidding process as per the guidelines of the GOI – EQ Mag

0
0
Anand Gupta Editor - EQ Int'l Media Network