Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected through inter-State Transmission System as per the Guidelines of Ministry of Power – EQ Mag Pro
0
0
Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected through inter-State Transmission System as per the Guidelines of Ministry of Power.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected through inter-State Transmission System – EQ Mag Pro
- Petition seeking an appropriate mechanism for grant of an appropriate adjustment/compensation to offset financial/ commercial impact of Change in Law events on account of imposition of Goods and Service Tax – EQ Mag Pro