Petition for adoption of tariff for 334 MW Solar Power Plants connected to the Inter-state Transmission System linked with Setting-up of Solar Manufacturing Plant – EQ
0
0
Petition for adoption of tariff for 334 MW Solar Power Plants connected to the Inter-state Transmission System linked with Setting-up of Solar Manufacturing Plant
For more information please see below link:
Related posts:
- A petition before the Central Electricity Regulatory Commission seeking an appropriate mechanism for grant of an appropriate compensation to offset financial impact of change in law – EQ Mag Pro
- Petition of PPA executed between M/s Masaya Solar Energy Private Limited and SECI inter alia seeking extension of time for achieving Financial Closure – EQ Mag Pro
- Petition of PPA executed between the SECI and Arina Solar Power Limited seeking direction to restrain SECI from invoking the bank guarantees – EQ Mag Pro
- Petition of PPA for seeking in-principal approval for Change in Law event i.e. Finance Department (Tax Division), Government of Rajasthan – EQ Mag