
Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to ISTS and selected through competitive bidding process – EQ Mag Pro
0
0
Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to ISTS and selected through competitive bidding process.
For more information please see below link:
Related posts:
- Petition For Truing up of Annual Fixed Charges For 2014-19 Tariff Period
- Petition For Approval of Tariff of Circulating Fluidized Bed Combustion (CFBC) Technology Based NLC Thermal Power Station-II
- Petition For Truing Up of Annual Fixed Charges For 2014-19 Tariff period in Respect of the Korba Super Thermal Power Station Stage
- Petition for approval of tariff of Rampur Hydro Power Station (412 MW) for the period from 1.4.2019 to 31.3.2024 – EQ Mag Pro