1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff for 600 MW (out of 1200MW) Wind-Solar Hybrid Power Projects (Tranche-II) connected to the inter-State Transmission System
Petition for adoption of tariff for 600 MW (out of 1200MW) Wind-Solar Hybrid Power Projects (Tranche-II) connected to the inter-State Transmission System

Petition for adoption of tariff for 600 MW (out of 1200MW) Wind-Solar Hybrid Power Projects (Tranche-II) connected to the inter-State Transmission System

0
0

Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 600 MW (out of 1200MW) Wind-Solar Hybrid Power Projects (Tranche-II) connected to the inter-State Transmission System and selected through competitive bidding process as per the guidelines issued by Ministry of New and Renewable Energy on 25.5.2018. Solar Energy Corporation of India Limited (SECI)

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *