Petition for adoption of tariff for 8800 MW Solar Power Plant connected to Inter-State Transmission System linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro
0
0
Petition for adoption of tariff for 8800 MW Solar Power Plant connected to Inter-State Transmission System linked with Setting-up of Solar Manufacturing Plant.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System – EQ Mag Pro
- Petition for approval of the Commission for revision in tariff pursuant to the discount to be offered for generation and supply of electricity by the Petitioner to the Respondents using coal available under the coal linkage as per the SHAKTI – EQ Mag Pro