Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process – EQ Mag Pro
0
0
Petition for adoption of tariff for 8800 MW Solar Power Plants connected to InterState Transmission System (ISTS) linked with Setting up of 2200 MW Solar Manufacturing Plant, selected through Competitive Bidding Process.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition For Truing Up of Tariff For 2014-19 And Determination of Tariff For 2019-24 of Dulhasti Hydroelectric Power Station (390 MW)