
Petition for Adoption of tariff for Solar PV Power Projects (Tranche- XII) connected to Inter State Transmission System (ISTS) and selected through competitive bidding process – EQ
0
0
Petition for Adoption of tariff for Solar PV Power Projects (Tranche- XII) connected to Inter State Transmission System (ISTS) and selected through competitive bidding process
For more information please see below link:
Related posts:
- Petition of the PPA executed between Rattan India Solar 2 and SECI for seeking approval of Change in Law events due to enactment of the GST Laws – EQ Mag Pro
- Petition of PPA executed between the SBSR Power Cleantech Eleven Private Limited and SECI – EQ Mag
- Petition for adoption of tariff for Solar PV Power Projects (Tranche – XI) connected to the ISTS) and selected through competitive bidding process – EQ
- Petition of the PPA for the development of 50 MW ISTS connected wind project between Adani Wind Energy Kutchh One Limited & SECI – EQ