1. Home
  2. Policy & Regulation
  3. Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ
Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ

Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network