
Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option” – EQ
0
0
Petition for Adoption of tariff for Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with Energy Storage System with “Greenshoe Option”
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power from ISTS-Connected Renewable Energy Power Projects with Energy Storage Systems, Ministry of Power – EQ
- Petition for Adoption of Tariff of 960 MW from ISTS connected Wind-Solar Hybrid Power Projects system under TBCB process – EQ
tags:
1200 MW Firm Adoption of Tariff CERC Dispatchable Power ENERGY STORAGE SYSTEM GREENSHOE OPTION ISTS-CONNECTED RE power projects REGULATIONS