Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Projects (Tranche-III) connected to the ISTS and selected through Competitive Bidding Process as per the Guidelines of MNRE, Government of India – EQ Mag Pro
0
0
Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Projects (Tranche-III) connected to the ISTS and selected through Competitive Bidding Process as per the Guidelines of MNRE, Government of India.
For more information please see below link:
Related posts:
- Petition For approval of “Change in Law” seeking an appropriate mechanism for grant of an appropriate adjustment on account of imposition of safeguard duty on solar cells/modules – EQ Mag Pro
- Petition for adoption of tariff for the 2000 MW Solar Power Projects (Tranche-IX) connected to the Inter-State Transmission System (ISTS) and selected through Competitive Bidding Process – EQ Mag Pro
- Petition for adoption of tariff for the 1110 MW Wind-Solar Hybrid Power Project (Tranche-III) connected to the inter-State Transmission System – EQ Mag Pro
- Petition of tariff for 970 MW Wind Power Projects (Tranche-IX) connected through inter-State Transmission System – EQ Mag Pro