Petition for adoption of tariff for the 550 MW Wind Power Projects connected to Inter-State Transmission System
0
0
Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for the 550 MW Wind Power Projects connected to Inter-State Transmission System (ISTS) and selected through competitive bidding process as per the guidelines issued by Ministry of Power on 8.12.2017
For more information please see below link:
Related posts:
- Petition for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII)
- In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System
- Petition for adoption of tariff for 3000 MW Grid Connected Solar PV Power Projects
- In the matter of: Interlocutory Application for urgent listing and interim order in the Petition with CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 seeking directions to Respondent