![Petition for adoption of tariff for the 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) SECIL – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff for the 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) SECIL – EQ Mag
0
0
Petition for adoption of tariff for the 600 MW Solar Power Projects (Tranche VIII) connected to the Inter-State Transmission System (ISTS) SECIL
For more information please see below link:
Related posts:
- Petition Withdrawn by ACME Solar for Termination Petition for 600 MW Project
- Petition for approval of tariff of Kameng Hydroelectric Power Plant (KaHEP) (600 MW) NEEPCO – EQ Mag
- Petition for approval of tariff of Kameng Hydroelectric Power Plant (KaHEP) (600 MW) – EQ Mag
- Petition for truing-up of tariff for the period 2014-19 and determination of tariff for the period 2019-24 in respect of Chamera-III Hydroelectric Project (231 MW) – EQ Mag