Petition for adoption of tariff for the 970 MW Wind Power Projects connected to the Inter-State Transmission System (ISTS) – EQ Mag Pro
0
0
Petition for adoption of tariff for the 970 MW Wind Power Projects connected to the Inter-State Transmission System (ISTS).
For more information please see below link:
Related posts:
- Petition For Truing Up of of Tariff For the 2014-19 Tariff Period in Respect of Jhanor Gandhar GPS (657.39 MW) – EQ Mag Pro
- Petition For Seeking Adjudication of Disputes And Differences Under the PPA And Regard to Non-Payment of Tariff And Unilateral Deduction of Capacity Charges – EQ Mag Pro
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW, ISTS connected Solar PV Power Projects Under Open Category – EQ Mag Pro
- PGCIL has filed the instant petition for truing up of the capital expenditure of the 2014-19 tariff period and for determination of transmission tariff for the period from 1.4.2019 to 31.3.2024 under the CERC – EQ Mag Pro