
Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Firm & Despatchable Power from ISTS connected Renewable Energy Power Projects – EQ
0
0
Petition for Adoption of Tariff for the ISTS Grid connected 1400 MW Firm & Despatchable Power from ISTS connected Renewable Energy Power Projects
For more information please see below link:
Related posts:
- Petition for Adoption of Tariff for procurement of power from the 760 MW Firm and Dispatchable Power from ISTS-Connected Renewable Energy Power Projects with Energy Storage Systems, Ministry of Power – EQ
- Petition for Adoption of Tariff 1200 MW Firm & Despatchable Power with “Greenshoe Option” from ISTS connected RE Power Projects coupled with Energy Storage System – EQ
- Petition for Adoption of Tariff of 960 MW from ISTS connected Wind-Solar Hybrid Power Projects system under TBCB process – EQ
- Petition for Adoption of Tariff for the ISTS Grid connected Solar Photo Voltaic Projects of 2400 MW with “Greenshoe Option” – EQ
tags:
1400 MW Firm Adoption of Tariff CERC Despatchable Power ISTS Grid connected REGULATIONS Renewable Energy Power Projects