![Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the Inter-State Transmission System (ISTS) – EQ Mag](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the Inter-State Transmission System (ISTS) – EQ Mag
0
0
Petition for adoption of tariff for the Wind Power Projects (Tranche-XI) connected to the Inter-State Transmission System (ISTS).
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche – X) connected to the Inter-State Transmission System – EQ Mag Pro
- Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to the inter-State Transmission System – EQ Mag Pro
- Petition for adoption of tariff for 1200 MW Wind Power Projects (Tranche-X) connected to the Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro
- Petition for adoption of tariff for renewable energy projects connected to ISTS with assured peak power supply in India – EQ Mag