1. Home
  2. Policy & Regulation
  3. Petition for adoption of tariff for Wind Power Projects (Tranche – XII) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process – EQ
Petition for adoption of tariff for Wind Power Projects (Tranche – XII) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process – EQ

Petition for adoption of tariff for Wind Power Projects (Tranche – XII) connected to the Inter-State Transmission System (ISTS) and selected through competitive bidding process – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network