Petition for adoption of tariff of 3 GW Renewable Energy (RE) power Inter State Transmission System (ISTS) and selected through a competitive bidding process – EQ
0
0
Petition for adoption of tariff of 3 GW Renewable Energy (RE) power Inter State Transmission System (ISTS) and selected through a competitive bidding process
For more information please see below link:
Related posts:
- CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
- Determination of levellised generic tariff for FY 2021-22 under Regulation 8 of the Central Electricity Regulatory Commission Regulations, 2020.
- In the Matter of Methodology for Computing the Escalation Rates and Other Parameters for the Purpose of Bid Evaluation and Payment for Procurement of Power from RE Projects
- Petition for adoption of tariff of 3 GW Renewable Energy (RE) power projects connected to the ISTS and selected through a competitive bidding process – EQ