1. Home
  2. Policy & Regulation
  3. Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process – EQ
Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process – EQ

Petition for Adoption of Tariff of 690 MW Wind Power Projects (Tranche XIV) connected to the Inter-State Transmission System and selected through Competitive Bidding Process – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network