![Petition for adoption of transmission charges with respect to ISTS being established by Khavda Bhuj Transmission Limited. Khavda-Bhuj Transmission Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for adoption of transmission charges with respect to ISTS being established by Khavda Bhuj Transmission Limited. Khavda-Bhuj Transmission Limited – EQ Mag Pro
0
0
Petition for adoption of transmission charges with respect to ISTS being established by Khavda Bhuj Transmission Limited. Khavda-Bhuj Transmission Limited.
For more information please see below link:
Related posts:
- Petition For Adoption of Transmission Charges
- Petition for adoption of transmission charges with respect to the Transmission System “Evacuation of power from RE sources in Koppal Wind Energy Zone (Karnataka) (2500 MW)” – EQ Mag Pro
- Petition for adoption of transmission charges with respect to the transmission system being established by POWERGRID Sikar Transmission Limited – EQ Mag Pro
- Petition (“Change in Law”) of the PPA executed between M/s Uttam Sugar Mills Ltd. and Uttarakhand Power Corporation Ltd – EQ Mag Pro