Petition for adoption of transmission charges with respect to the transmission system being established by POWERGRID Sikar Transmission Limited – EQ Mag Pro
0
0
Petition for adoption of transmission charges with respect to the transmission system being established by POWERGRID Sikar Transmission Limited.
For more information please see below link:
Related posts:
- Petition For Adoption of Transmission Charges
- Petition For determination of transmission tariff of the 2019-24 tariff period for two assets under “Transmission system” – EQ Mag Pro
- Petition for adoption of transmission charges with respect to the Transmission System “Evacuation of power from RE sources in Koppal Wind Energy Zone (Karnataka) (2500 MW)” – EQ Mag Pro
- Petition for truing-up of tariff for the 2014-19 tariff period and for determination of tariff for the 2019-24 tariff period in respect of Udupi Thermal Power Plant (1200 MW) – EQ Mag Pro