Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the Inter-State Transmission System – EQ Mag Pro
0
0
Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the Inter-State Transmission System and selected through competitive bidding process under Central Power Sector Undertaking (CPSU) Scheme Phase-II.
For more information please see below link:
Related posts:
- Petition for adoption of usage charges for 1,692 MW Solar Photovoltaic (PV) Power Station (Tranche-I & II) connected to the inter-State Transmission System and selected through competitive bidding process under‘ CPSU Scheme Phase-II – EQ Mag Pro
- Petition of the PPA Entered Into Between SECI And PSPL Seeking Directions to SECI to Act in Accordance With Article 11 of the PPA
- Petition For Seeking Relief Under Force Majeure And Change in Law of Transmission Service Agreement
- Essar Electric Power Development Corporation Limited, Had Filed the Petition For Down-Gradation of Inter-State Trading License