Petition for approval for tie up of 1000MW / 6000 MWh per day (continuous discharge of 4 hours) on long term basis from Pump Storage based energy storage – EQ
0
0
Petition for approval for tie up of 1000MW / 6000 MWh per day (continuous discharge of 4 hours) on long term basis from Pump Storage based energy storage
For more information please see below link:
Related posts:
- Petition For Act for removal of difficulty in implementation of RERC Open Access Regulations, 2016 – EQ Mag Pro
- Petition has been filed bySaurya Urja Company of Rajasthan Limited (“Appellant”) against the impugned order passed by the Rajasthan Electricity Regulatory Commission (“RERC) – EQ Mag Pro
- Petition for approval of levelized tariff discovered through transparent competitive bidding carried out by JVVNL for 4.24 MW pilot Solar Power Project – EQ Mag Pro
- Petition for seeking approval of deviations, along with justifications in the Model Bidding Document for procurement of 160 MW RTC power – EQ Mag