Petition for approval of additional expenditure on account of installation of various emission control systems at NLCIL Thermal Power Station-II (Stage I-3 X 210 MW & Stage II-4 X 210 MW) and Thermal Power Station-I Expansion (2×210 MW) – EQ Mag Pro
0
0
Petition for approval of additional expenditure on account of installation of various emission control systems at NLCIL Thermal Power Station-II (Stage I-3 X 210 MW & Stage II-4 X 210 MW) and Thermal Power Station-I Expansion (2×210 MW).