Petition for approval of Additional Expenditure on installation of various Emission Control Systems at Chandrapura Thermal Power Station Unit-7 & 8 having an installed capacity of 500 MW – EQ Mag
0
0
Petition for approval of Additional Expenditure on installation of various Emission Control Systems at Chandrapura Thermal Power Station Unit-7 & 8 having an installed capacity of 500 MW
For more information please see below link:
Related posts:
- Petition For Approval of ACE on Installation of Various Emission Control Systems At Sipat Super Thermal Power Station Stage-I
- Petition For Approval of Additional Expenditure on Installation of Various Emission Control Systems At NSPCL Bhilai Expansion Plant (2×250 MW) – EQ Mag Pro
- Petition for seeking approval of the additional capital and operational expenditure on account of installation of various Emission Control Systems in compliance with Ministry of Environment, Forest and Climate Change – EQ Mag Pro
- Petition for approval of Additional Expenditure on installation of various Emission Control Systems at Chandrapura Thermal Power Station Unit-7 & 8 having an installed capacity of 500 MW – EQ Mag Pro