Petition for approval of tariff for Kahalgaon STPS Stage-I (840MW) for the period from 01.04.2019 to 31.03.2024. NTPC Limited – EQ
0
0
Petition for approval of tariff for Kahalgaon STPS Stage-I (840MW) for the period from 01.04.2019 to 31.03.2024. NTPC Limited
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 8800 MW Solar Power Plant connected to Inter-State Transmission System linked with Setting-up of Solar Manufacturing Plant – EQ Mag Pro
- Petition for approval of tariff of Faridabad Gas Based Power Station (431.59 MW), for the period 2019-24. NTPC Limited – EQ Mag
- Petition for seeking declaration of Change in Law event in terms of the Agreement for Procurement of Power and compensation on account of increase in cost of power generation by MB Power (Madhya Pradesh) Limited – EQ
- Petition for the development of 300 MW ISTS connected Wind-Solar Hybrid power project, entered between AHEJTL and SECI – EQ