Petition for approval of tariff for Koldam Hydroelectric Project (800 MW) for the period 2019-24. NTPC Limited – EQ
0
0
Petition for approval of tariff for Koldam Hydroelectric Project (800 MW) for the period 2019-24. NTPC Limited
For more information please see below link:
Related posts:
- Petition for revision of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Darlipali Super Thermal Power Station Stage-I (2×800 MW) for the period from COD of Unit-I (i.e. 1.3.2020) to 31.3.2024 – NTPC Limited – EQ Mag
- Petition approval of tariff of Singrauli Super Thermal Power Station (2000 MW) for the period 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag
- Petition for truing-up of tariff of Ramagundam STPS, Stages-I&II (2100 MW) for the period 2014-19. NTPC Limited – EQ Mag