Petition for approval of tariff for NLC Thermal Power Station-II, 1470 MW (TPS- II Stage- I (630 MW) and Stage-II (840 MW) NLC India Limited – EQ Mag
0
0
Petition for approval of tariff for NLC Thermal Power Station-II, 1470 MW (TPS- II Stage- I (630 MW) and Stage-II (840 MW) NLC India Limited.
For more information please see below link:
Related posts:
- Petition for determination of the project specific tariff. NLC India Limited – EQ Mag Pro
- Petition for approval of tariff of Circulating Fluidized Bed Combustion (CFBC) Technology based NLC Thermal Power Station-II Expansion for the 2019-24 tariff period. NLC India Limited – EQ Mag Pro
- Petition seeking approval for input price of coal supplied from Talabira Mines to end use generating stations – EQ Mag
- Petition for adoption of transmission charges with respect to ISTS being established Karur Transmission Limited. Karur Transmission Limited – EQ Mag Pro