![Petition for approval of tariff of Circulating Fluidized Bed Combustion (CFBC) Technology based NLC Thermal Power Station-II Expansion for the 2019-24 tariff period. NLC India Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for approval of tariff of Circulating Fluidized Bed Combustion (CFBC) Technology based NLC Thermal Power Station-II Expansion for the 2019-24 tariff period. NLC India Limited – EQ Mag Pro
0
0
Petition for approval of tariff of Circulating Fluidized Bed Combustion (CFBC) Technology based NLC Thermal Power Station-II Expansion for the 2019-24 tariff period. NLC India Limited.
For more information please see below link:
Related posts:
- Petition for determination of the project specific tariff. NLC India Limited – EQ Mag Pro
- Petition of PPA executed between UHBVNL and Adani Power Limited – EQ Mag Pro
- Petition for determination of tariff of combined cycle gas based Palatana Power Project of ONGC Tripura Power Company Limited (726.6 MW) for the 2019-24 tariff period OTPC Limited – EQ Mag Pro
- Petition for revision of tariff for the period 2014-19 after truing up exercise in respect of Ramagundam Super Thermal Power Station, Stage I & II – EQ Mag Pro