Petition for approval of tariff of Koteshwar Hydroelectric Project (KHEP) (4x100MW) for the period 1.4.2019 to 31.3.2024. THDC India Limited – EQ Mag Pro
0
0
Petition for approval of tariff of Koteshwar Hydroelectric Project (KHEP) (4x100MW) for the period 1.4.2019 to 31.3.2024. THDC India Limited.
For more information please see below link:
Related posts:
- Petition for adoption of tariff for 400 MW Renewable Energy Projects connected to ISTS and selected through competitive bidding process – EQ Mag Pro
- Petition For Adoption of Tariff For Inter-State Transmission System Connected 1200 MW
- Petition for revision of tariff of Dadri Gas Power Station (829.78 MW) – EQ Mag Pro
- Petition for adoption of tariff for 2000 MW Solar Power Projects (Tranche-IX) connected to Inter-State Transmission System and selected through competitive bidding process – EQ Mag Pro