Petition for approval of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro
0
0
Petition for approval of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW).
For more information please see below link:
Related posts:
- CERC Adopted Individual Tariff for 3 GW of the Power Projects
- Petition For Truing up of Annual Fixed Charges For 2014-19 Tariff Period
- Petition For Approval of Tariff of Circulating Fluidized Bed Combustion (CFBC) Technology Based NLC Thermal Power Station-II
- Petition for revision of tariff of Ramagundam Super Thermal Power Station Stage-III (500 MW) – EQ Mag Pro