![Petition for approval of tariff of Sipat Super Thermal Power Station, Stage-I NTPC Limited – EQ Mag Pro](https://www.eqmagpro.com/wp-content/uploads/2019/10/Order-Seeking-for-the-Condonation-of-Delay-of-273-days-in-filing-the-Appeal-as-against-the-Impugned-Order-by-CERC.jpg)
Petition for approval of tariff of Sipat Super Thermal Power Station, Stage-I NTPC Limited – EQ Mag Pro
0
0
Petition for approval of tariff of Sipat Super Thermal Power Station, Stage-I NTPC Limited.
For more information please see below link:
Related posts:
- Petition for approval of tariff of Feroze Gandhi Unchahar Thermal Power Station Stage-IV (500 MW) for the 2019-24 tariff period NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of the National Capital Thermal Power Station Stage-II (980 MW) NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Singrauli Super Thermal Power Station (2000 MW) NTPC Limited – EQ Mag Pro
- Petition for approval of tariff of Sipat Super Thermal Power Station Stage-II (1000 MW) NTPC Limited – EQ Mag Pro